Transport Infrastructure Projects
| Princes Bridge Load Assessment Detailed inspection and load-rating test for this heritage structure. pitt&sherry provided many services. |
![]() |
Palmers Road The Palmers Road Project is a $21M infrastructure project being delivered under a D&C delivery methodology for VicRoads. |
| Don Interchange- Bass Highway Tender design and subsequent detailed design of a two span post-tensioned voided slab bridge - the bridge spans the Bass Highway and is located on a 100m radius curve. |
| Stock Subway Bridge Repair and Strengthening pitt&sherry conducted a risk assessment leading to repairs to the Stock Subway Bridge in Melbourne. |
Sustainable Thinking
The world is moving rapidly towards a position of determining initiatives on the basis of their capacity to contribute to sustainable objectives. We believe this shift in global value systems is permanent and gaining momentum, with sufficient magnitude to require a proportionate response from pitt&sherry. Find Out More






