Transport Infrastructure
- All Projects
- Horace Street Traffic Management Treatments
- Williams Landing Station - Tender Design
- Sladen Street Road Safety Audit Response
- Princes Bridge Load Assessment
- Palmers Road
- Sladen Street
- Don Interchange- Bass Highway
- Arden Street Bridge Strengthening & Rehabilitation
- Airport Link - Traffic Management
- Traffic Management & Construction - South Road Superway
- Stock Subway Bridge Repair and Strengthening
Williams Landing Station - Tender Design
pitt&sherry undertook the tender design for this new premium tain station. The key feature of the project is an innovative circular truss with a clear 60m span over the Princes Freeway and then linking into the proposed station concourse structure.
The three dimensional modelling of the structure needed to take into account the unique architectural form with an emphasis on ensuring the dynamic performance of the structure would be satisfactory. Another key driver for the structural design was the proposed method of installation of the main span over the Princes Freeway.
Sustainable Thinking
The world is moving rapidly towards a position of determining initiatives on the basis of their capacity to contribute to sustainable objectives. We believe this shift in global value systems is permanent and gaining momentum, with sufficient magnitude to require a proportionate response from pitt&sherry. Find Out More





