A Category C Cell is a waste storage facility that is designed to store waste materials with a high level of contamination. To enable this a more sophisticated lining system is required on the floor and walls of the cell to prevent contamination escaping to the environment. pitt&sherry had to design this liner system to meet the stringent requirements set by the Environmental ProtectionAuthority.This is the first C Cell in Tasmania – prior to this any high level contaminated waste was shipped to Melbourne or Sydney for storage – with obvious environmental risks or stored at the owners site – which is clearly unacceptable.The site (and cell) is owned and operated by Southern Waste Solutions, which is a joint venture between four of the local councils in Southern Tasmania. pitt&sherry has been providing on going engineering and environmental services to Southern Waste Solutions since 2008.Learn more about our environmental engineering services. C Cell in Tasmania contamination Waste Solutions For more information please contact: Rob Casimaty Executive Director & Senior Principal Engineer Mobile 1300 748 874 Email info@pittsh.com.au