Waste Storage Design – prevents contamination escaping into the environment

A Category C Cell is a waste storage facility that is designed to store waste materials with a high level  of contamination.  To enable this a more sophisticated lining system is required on the floor and walls of the cell to prevent contamination escaping to the environment.  pitt&sherry had to design this liner system to meet the stringent requirements set by the Environmental Protection Authority.

This is the first C Cell in Tasmania – prior to this any high level contaminated waste was shipped to Melbourne or Sydney for storage – with obvious environmental risks or stored at the owners site – which is clearly unacceptable.

The site (and cell) is owned and operated by Southern Waste Solutions, which is a joint venture between four of the local councils in Southern Tasmania.  pitt&sherry has been providing on going engineering and environmental services to Southern Waste Solutions since 2008.

Learn more about our environmental engineering.

Water and Sewerage Capability Statement Nov 2018

For further information
contact the specialist —
Rob Casimaty Senior Principal Engineer

Mobile 0447 557 271
Email rcasimaty@pittsh.com.au

Accreditation & Memberships

2018/07/nata.png
2018/07/bsi.png
2018/07/engineers-australia.png
2018/07/concrete-institute.png
2018/07/roads-australia.png
2018/07/leea.png
2018/07/aapa.png