Bridges

Bridges

Practical bridge engineering across design, inspection, assessment and rehabilitation.

Overview
Overview
What we do
Our approach
Our projects
Our team
FAQs

Get in touch with us today!

Let's chat
Bridges and Australia’s infrastructure challenge

Bridges and Australia’s infrastructure challenge

Australia's bridge network is under pressure. Thousands of road and rail bridges are ageing, many designed decades ago for lighter loads and to less onerous design standards. As freight demand grows bridge owners face difficult decisions about where to invest, what to maintain, and when to replace.

Whether the challenge is extending the life of an existing structure, assessing bridge capacity for heavier vehicles, or delivering a new bridge on a complex corridor, sound engineering judgement has never been more important.

We work with government agencies, contractors and other bridge asset owners to provide support for these challenges through practical bridge engineering and consulting services across the asset lifecycle.

What we do

Our bridge engineering services

We deliver bridge engineering services across every stage of the asset lifecycle. Whether you’re planning a new structure, managing an existing network or extending the life of ageing infrastructure, our team brings technical depth and practical experience.

Bridge asset management
Bridge feasibility, concept and detailed design
Bridge geotechnical investigations
Bridge hydraulic analysis
Bridge inspections and monitoring
Bridge proof engineering
Bridge repair, strengthening and rehabilitation
Fatigue assessments and condition monitoring
Load assessments of existing bridges
Resilience planning and assessments
Temporary works
Our approach

How we deliver projects

Whole-of-life asset thinking

Whole-of-life asset thinking

We take a long-term view of bridge infrastructure. Rather than treating design, construction, inspection, and rehabilitation as separate tasks, we consider how decisions at each stage affect performance, safety, and cost throughout the life of a structure. This helps clients prioritise investment, reduce whole-of-life costs, and extend the useful life of their networks.
Our projects

Explore our work

Transport
Styx River Bridge Replacement
Styx River Bridge Replacement
Tasmania • November 2023
Transport
City of Melbourne Bridge Work
City of Melbourne Bridge Work
Victoria
Transport
The John Gorton Drive and Molonglo River Bridge Crossing
The John Gorton Drive and Molonglo River Bridge Crossing
Australian Capital Territory
Transport
Childs Road Upgrade
Childs Road Upgrade
Victoria • March 2023
Transport
Angliss Stock Bridge
Angliss Stock Bridge
Victoria • February 2025
Our team

Get in touch with our bridge team

Ben Hart
Capability Leader – Senior Principal Bridges Engineer

Irene Scott
General Manager Bridge & Structural Services and Senior Principal Engineer

FAQs

Your questions answered

What is the difference between Level 1, Level 2 and Level 3 bridge inspections?

What bridge strengthening options are available for ageing structures?

How do you determine the load capacity of an existing bridge?

Get in touch to discuss your bridge project